
A 14-storey mixed-use residential and commercial development on Kish Island. From the start of construction I planned, coordinated and managed the project's technical operations: coordination with the client, consultants and contractors; site mobilisation; procurement of materials and reinforcing steel; coordinating the tower-crane installation; reviewing construction drawings; technical documentation and reports; and tracking progress from the foundations to the parking levels and the reinforced-concrete structure.
I also supervised the foundation and structural works and the quality-control procedures, so that the work matched the drawings, the technical specifications and the project standards.
- Location
- Amir Kabir 6, Kish Island
- Date
- 2025–2026
- Role
- Technical Office Supervisor




